The challenge: A corporate DB plan wanted to explore alternate methods for calculating its discount rate and pension expense
A publicly owned client in the manufacturing sector asked Milliman to consider alternative methods to determine their discount rate and calculate their pension expense. The client sponsors an open accruing final average pay plan. Due to the active nature of the plan, the client has a significant Service Cost (SC). The client currently uses the FTSE yield curve to first calculate a single aggregate discount rate and then uses that aggregate rate to develop the FASB Projected Benefit Obligation (PBO), SC, and Interest Cost (IC), which are accounting components used to determine the pension expense. This is referred to as the aggregate rate method.
The client’s funding policy is to make a midyear contribution equal to the SC to the extent that the assets are less than the PBO. Due to the combination of this funding policy and favorable investment experience, the plan is currently very well funded, with a PBO-funded status of 147% on a market value basis.
The objective of the client’s new chief financial officer was to consider all alternatives to the actuarial method used to determine the discount rate and calculated pension expense before continuing their current method or electing a new one.
The approach: Milliman outlined different accounting methods to help the pension plan reduce its pension expense
Milliman consultants worked with the client to set achievable goals, understand their risk tolerance, and discuss different accounting methodologies. Discussions began with Milliman outlining various optional methodologies. The client expressed interest in exploring the following possibilities.
- Aggregate rate method—FTSE yield curve: the client’s current method, which uses the FTSE yield curve to calculate a single aggregate discount rate
- Aggregate rate method—FTSE above-median yield curve: similar approach as the first method, but this would replace the FTSE yield curve with the FTSE above-median yield curve
- Spot rate method—FTSE yield curve: applies the spot rates from the FTSE yield curve directly to the projected payouts to develop the accounting components used to determine the pension expense
- Theoretical bond matching portfolio: develops a theoretical portfolio of currently available bonds to match the cash flow of the projected payouts; the aggregated yield curve of the theoretical portfolio is then used to develop the accounting numbers
The methods were compared on the following three metrics:
- Calculated PBO
- Calculated SC
- Calculated IC
Calculated values:
Following, the effective interest rate (EIR), PBO, SC, and IC are shown for each of the four methods considered.
| Method (values in $) | EIR | PBO | SC | IC |
|---|---|---|---|---|
| Aggregate rate - FTSE* | 5.54% | 206,900,000 | 7,190,000 | 11,200,000 |
| Aggregate rate - FTSE above median | 5.65% | 203,700,000 | 7,010,000 | 11,240,000 |
| Spot rate | 5.54% | 206,900,000 | 6,840,000 | 10,150,000 |
| Theoretical bond matching | 5.83% | 198,500,000 | 6,740,000 | 11,300,000 |
*Current client methodology.
EIR
The EIR is the single rate that reproduces the same PBO as the full yield curve. In general, the higher the EIR, the lower the PBO. The EIR of 5.54% under the aggregate rate—FTSE and spot rate methods is the same since the two methods are based on the same underlying yield curve. The EIRs for the aggregate rate—FTSE above-median and theoretical bond matching methods are higher than 5.54% since the rates for the underlying yield curve and bond matching portfolio, respectively, are higher. The aggregate rate—FTSE above-median method will generally produce higher EIRs than the aggregate rate—FTSE method. While both pull from the same high-quality corporate bond universe, the above-median yield curve focuses on bonds with yields above the median. Similarly, the theoretical bond matching portfolio generally produces a higher EIR than the aggregate rate—FTSE method due to selecting a smaller number of specific bonds with the highest yields at each duration to match the cash flows.
PBO
The first metric is the PBO, which is the measured value of the obligation or the cost of accrued benefits, including projection of future salaries. The PBO-funded percentage can then be calculated by dividing the market value of plan assets by the calculated PBO. The PBO-funded percentage is often used as shorthand for how well funded the plan is. In our client’s case, the PBO is used directly in the funding policy. For some clients, the PBO and the funded status can impact bond covenants.
Of the four methods studied, the theoretical bond matching portfolio provides the smallest PBO, followed by the aggregate rate—FTSE above-median method. The largest PBO is calculated through the use of the FTSE yield curve with the same value for both the aggregate rate—FTSE and spot rate methods. The largest PBO was about 4.2% higher than the smallest.
SC
The second metric is the SC, which is the cost of benefits employees earned in the year and is considered operating income. Our client allocates the SC to their divisions and treats it as a current labor cost.
Of the four methods studied, the theoretical bond matching portfolio provides the smallest SC followed by the spot rate method. The largest SC is developed by the aggregate rate—FTSE method. The largest SC was about 6.7% higher than the smallest.
Note that while the aggregate rate—FTSE and spot rate methods are based on the same underlying yield curve, and have the same EIR and PBO, the two methods produce different SC amounts. This is due to how the yield curve rates are applied to the projected payouts. The aggregate rate—FTSE, aggregate rate—FTSE above-median, and theoretical bond matching methods first calculate an EIR. The single EIR is then used to calculate the PBO, SC, and IC. Under the spot rate method, the PBO, SC, and IC are instead calculated by applying each rate of the yield curve (which varies by duration) to the applicable projected payout for that same duration. Typically, yield curves have lower rates at earlier durations and increase to higher rates at later durations. For an open accruing plan like this one, this leads to a lower SC under the spot rate method compared to the aggregate rate—FTSE method.
IC
The final metric is the IC, which represents the increase in the pension obligation due to the passage of time and is typically accounted for outside of the operating income.
Of the four methods studied, the spot rate method provides the smallest IC, while the other methods all had approximately the same IC. The largest IC was about 11.3% higher than the smallest.
Similar to the SC, the spot rate method is unique from the other three methods in how the IC is calculated, by applying the spot rate of the FTSE curve directly rather than using the EIR. That is why the IC under the spot rate method differs from the IC under the aggregate rate—FTSE method, even though they are based on the same yield curve.
Summary
The following table summarizes the various metrics under the current methodology as the baseline compared to the results of the other methods.
| Method | EIR | PBO | SC | IC |
|---|---|---|---|---|
| Aggregate rate - FTSE* | 5.54% | $206.9 M | $7.19 M | $11.2 M |
| Aggregate rate - FTSE above median | Higher | Lower | Lower | Higher |
| Spot rate | Same | Same | Lower | Lowest |
| Theoretical bond matching | Highest | Lowest | Lowest | Highest |
*Current client methodology.
The outcome: Spot rate method helps publicly traded company reduce its pension expense
As shown in the results above, there are different advantages and disadvantages to each of the four methods studied. Though the EIR, PBO, SC, and IC are not drastically different under each method, the client recognized that just because one method may lead to a lower PBO, that does not mean that same method will also end up with the lowest SC or IC.
There are additional factors the client wanted to consider other than just the numerical results. The aggregate rate—FTSE method is the most common and easiest to understand, and was already approved by their auditor. The theoretical bond matching model is more complicated in that it requires an additional step to develop the theoretical portfolio, which can lead to extra expenses for the client and auditor scrutiny.
Final decision: After reviewing the results with the client, they believe the spot rate method was most aligned with the company’s goals. The sum of the SC and IC is the smallest under the spot rate method, which leads to a lower pension expense. Because of their well-funded position, they were less concerned that the spot rate method led to the largest PBO. For these reasons, they will switch from the aggregate rate—FTSE method and adopt the spot rate method going forward.